| Project Phase |
Typical Tasks |
| Pre-Design |
- Analysis and documentation of needs, requirements, goals and objectives
- Space and adjacency requirments
- Special needs assessments
- Analysis of architectural parameters
- Analysis of schedule and budget
|
| Preliminary Design |
- Preliminary concept design
- Design layout options
- Focus on conceptual and thematic issues
- Interactive conceptual design review
- Preliminary budgetry information
|
| Design Development |
- Finalize, refine design presentation incorporating all necessary space plannning components of design
- Graphic presentation of finalized design include conceptual diagrams, space plans and plans for furniture, fixtures, and equipment, as well as elevations, sections, 3-D drawings, colors, materials, and finish samples
- Design of related elements and details
- Finalize color, materials and finish sections
|
| Construction Documents |
- Preparation of drafted, working drawings, and or contract documents
- Preparation of drawings, schedules, details, and specifications
- Preparation of equiptment documents
|
| Construction Administration |
- Guide and review construction and installation
- Periodic site visits
- Coordination of shop drawings
- Review of drawings with installer
|